Trueburton 2 Posted November 14, 2019 I am trying to build a simple garage with 12' ceilings, 42" foundation wall and an 8" drop from SWT to finish floor. When I change one number is changes the others, I go back and forth and feel like I am chasing myself in circles. I must be changing a value not meant to be changed. I have got the desired results a couple times but when I click OK and go into the cross section view, it as changed back to the original values. Is there a default setting I need to overide? Also, for getting the desired stem wall height and ceiling heights am I only suppose to change the absolute values and not the relative values? This seems way more difficult than it should be, there must be a simple step I am overlooking. Thanks! 1 Share this post Link to post Share on other sites
solver 644 Posted November 14, 2019 36 minutes ago, Trueburton said: I am trying to build a simple garage with 12' ceilings, 42" foundation wall and an 8" drop from SWT to finish floor. Set your garage defaults and build the foundation. 37 minutes ago, Trueburton said: but when I click OK and go into the cross section view, it as changed back to the original values. Instead of pressing Enter to exit a dialog, press Tab, check the values, then Enter. The software will adjust things that you do not see. Share this post Link to post Share on other sites
LawB10 11 Posted November 14, 2019 Turn off auto rebuild foundation, change swt H the only other number that changes is floor D. Share this post Link to post Share on other sites
Trueburton 2 Posted November 14, 2019 That was easy... thanks guys! Share this post Link to post Share on other sites