Trueburton Posted November 14, 2019 Share Posted November 14, 2019 I am trying to build a simple garage with 12' ceilings, 42" foundation wall and an 8" drop from SWT to finish floor. When I change one number is changes the others, I go back and forth and feel like I am chasing myself in circles. I must be changing a value not meant to be changed. I have got the desired results a couple times but when I click OK and go into the cross section view, it as changed back to the original values. Is there a default setting I need to overide? Also, for getting the desired stem wall height and ceiling heights am I only suppose to change the absolute values and not the relative values? This seems way more difficult than it should be, there must be a simple step I am overlooking. Thanks! 1 Link to comment Share on other sites More sharing options...
solver Posted November 14, 2019 Share Posted November 14, 2019 36 minutes ago, Trueburton said: I am trying to build a simple garage with 12' ceilings, 42" foundation wall and an 8" drop from SWT to finish floor. Set your garage defaults and build the foundation. 37 minutes ago, Trueburton said: but when I click OK and go into the cross section view, it as changed back to the original values. Instead of pressing Enter to exit a dialog, press Tab, check the values, then Enter. The software will adjust things that you do not see. Link to comment Share on other sites More sharing options...
LawB10 Posted November 14, 2019 Share Posted November 14, 2019 Turn off auto rebuild foundation, change swt H the only other number that changes is floor D. Link to comment Share on other sites More sharing options...
Trueburton Posted November 14, 2019 Author Share Posted November 14, 2019 That was easy... thanks guys! Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now