Hello,

I am working on a ranch house plan that has a walk out basement. So I have the stepped foundation at floor 0, the garage on floor 1 since floor 2 is a little higher & is the main floor. In trying to build a farmer's porch & a small rear deck off of floor 2, when I select build deck railing, the items get build on floor 1 so the entire structure is underground? Any suggestions are very welcome, as this is stumping the daylights out of me. Thank you all.

Link to comment
Share on other sites

Thank you Solver. I have been trying it on level 2. I have the floors separated since I need to use 16" I-joist as the framing for the 2nd floor. Will try to see if I can drop the floor enough to make it work. It's the only thing holding me up from finishing the preliminary design for the clients.

Link to comment
Share on other sites

  • Solution

I actually have it working now. I must have messed some seting up. With any luck I will be able to wrap this up for my customer shortly to review. I appreciate the fast reply from you. Great to have this type of support. Thank you

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share