eltyse Posted September 10, 2014 Share Posted September 10, 2014 If my entry landing is half way up the day light basement wall, how do I place the door so it spans both the basement wall and first floor wall? Link to comment Share on other sites More sharing options...
DavidJPotter Posted September 11, 2014 Share Posted September 11, 2014 Read these Knowledge Base Help articles please: http://www.homedesignersoftware.com/search/?q=split+level+entry&submit.x=0&submit.y=0&default_tab=support&site=chief_architect&client=chief_architect&restrict=ChiefArchitect&proxystylesheet=http%3A%2F%2Fwww.chiefarchitect.com%2Fsearch%2Fchiefsearch_stylesheet.xslt&output=xml_no_dtd DJP Link to comment Share on other sites More sharing options...
eltyse Posted September 11, 2014 Author Share Posted September 11, 2014 Thank you for the quick response but I do not see any mention of placing a door so it sits on the landing. When I try to place a door it will either jump to the basement or first floor but not the landing. Link to comment Share on other sites More sharing options...
Solution solver Posted September 11, 2014 Solution Share Posted September 11, 2014 Image shows a door placed where it opens between 2 floors. I added the door and positioned it (control-drag) where I wanted it in a 3D view. Initial placement has to be on one floor or the other, but then you may move it wherever you like. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now