Imyourguy

Mechanical systems

Recommended Posts

In the cost estimating of a project, how does I account for plumbing, heating and electrical systems?  Can I add line items to the material list to account for this? 

Share this post


Link to post
Share on other sites

Not sure what you are asking.

 

The software only does fixtures, not things like ducting or piping. 

 

What are you wanting to account for?

Share this post


Link to post
Share on other sites

Can I manually add line items to account for the cost that the program does not automatically calculate?  Such as electrical wiring and boxes, plumbing piping, in-floor heating, HWT tank, etc.

Share this post


Link to post
Share on other sites

I don't believe you can manually add, but you should be able to export the list, then make changes to it.

 

Open in a spreadsheet and add/change as required.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now