Frenchy99 Posted July 11, 2021 Share Posted July 11, 2021 My basement concrete foundation (stem wall) has to be 72” bellow the top of the basement concrete floor, then (still on floor 0) I need to build a Framed 108” wall (with siding) that will reach the lower level of floor 1. How do I do this? I tried using Pony wall but I’m totally stumped…. Link to comment Share on other sites More sharing options...
DavidJPotter Posted July 11, 2021 Share Posted July 11, 2021 The wall polylines of a pony wall are highly adjustable via the Wall Specification Dialog - Wall Types dialog or in elevation camera views. DJP Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now