GabrielMacias

Members
  • Posts

    1
  • Joined

  • Last visited

Posts posted by GabrielMacias

  1. For a weatherproof transition between these roof types, implement these critical steps:

    Structural Connection:

    • Install double 2x ledger board on main house with 1/2" galvanized through-bolts (spaced 16" OC)
    • Use Simpson H1 hurricane ties at rafter connections

    Water Management:

    • Step flashing must extend 12" up pitched roof under shingles
    • Saddle flashing over flat roof membrane (minimum 24-gauge galvanized)
    • Slope flat roof 1/4" per foot toward scupper drain

    Material Transitions:

    • Ice/water shield over entire flat roof deck + 3' up pitched roof
    • EPDM or TPO membrane for flat section with termination bar at pitch transition

    Climate Consideration: In freeze-thaw regions, add heating cable in gutter above transition to prevent ice dam formation.