jrv_5k

Members
  • Posts

    1
  • Joined

  • Last visited

Everything posted by jrv_5k

  1. I'm not sure that I'm posting this in the right place. I have a wall that is 68' long. We want brick to come up 30" all the way along the bottom of wall. The first two feet on each end we would like to be brick. Then, 48" of shake siding. Then 8' of lap siding. That will change back and forth until we get to 8' of brick in the middle, basically. Everytime I change one section it changes them all. I bumped a section out of line, changed the siding, slid it back. Does anyone have any ideas how to do this?