Imyourguy
-
Posts
6 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Posts posted by Imyourguy
-
-
Can I manually add line items to account for the cost that the program does not automatically calculate? Such as electrical wiring and boxes, plumbing piping, in-floor heating, HWT tank, etc.
-
In the cost estimating of a project, how does I account for plumbing, heating and electrical systems? Can I add line items to the material list to account for this?
-
How do I go about highlighting the gable portion of the wall as a separate wall?
Thank you.
-
When i change the material, only the lower part of the wall finish changes. The upper part stays with the default material.
-
How do i get the gable end part of the exterior wall to match the lower part of the exterior wall?
Mechanical systems
in Q&A
Posted
Thank you.