GabrielMacias

Members
  • Posts

    1
  • Joined

  • Last visited

Reputation

0 Neutral

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. For a weatherproof transition between these roof types, implement these critical steps: Structural Connection: Install double 2x ledger board on main house with 1/2" galvanized through-bolts (spaced 16" OC) Use Simpson H1 hurricane ties at rafter connections Water Management: Step flashing must extend 12" up pitched roof under shingles Saddle flashing over flat roof membrane (minimum 24-gauge galvanized) Slope flat roof 1/4" per foot toward scupper drain Material Transitions: Ice/water shield over entire flat roof deck + 3' up pitched roof EPDM or TPO membrane for flat section with termination bar at pitch transition Climate Consideration: In freeze-thaw regions, add heating cable in gutter above transition to prevent ice dam formation.