Hello all,
I noticed when looking at the structure of my wall, the brick ledge appears to be at least 12" below the floor height. The concrete crew uses a 2x6 when pouring, so just need a 1.5" ledge. Does anyone have a good pointer to fixing this?
Thanks in advance