new2HDproSteve

Members
  • Posts

    2
  • Joined

  • Last visited

Posts posted by new2HDproSteve

  1. Eric, thanks for your reply.   I have changed my signature as requested and have spent hours looking at/searching the sources offered without success.  The foundation along the side of the house slopes downhill (a grade beam) following the slope of the terrain (-18 degrees).  The sill plate is continuously roughly 16"  above grade.  [i.e. not stepped].  The floor above it is of course level so the cripple wall that supports it grows in height as it progress toward the back of the house from a few inches to about 9'.  How do I represent this in HD Pro 2018? Any help would be appreciated.  Steve